A body is projected up with a speed u and the time taken by it is T to reach the maximum height H. Pick out the correct statement.
1. It reaches H2 in T2 sec
2. It acquires velocity u2 in T2
3. Its velocity is u2 at H2
4. Same velocity at 2T

Subtopic:  Uniformly Accelerated Motion |
 50%
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

A body falling for 2 seconds covers a distance S equal to that covered in next second. Taking g=10m/s2,S=

1. 30 m

2. 10 m

3. 60 m

4. 20 m

Subtopic:  Uniformly Accelerated Motion |
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

A body dropped from a height h with an initial speed of zero, strikes the ground with a velocity 3km/h. Another body of the same mass is dropped from the same height h with an initial speed u'=4km/h. Find the final velocity of the second body with which it strikes the ground.

1. 3 km/h

2. 4 km/h

3. 5 km/h

4. 12 km/h

Subtopic:  Uniformly Accelerated Motion |
 75%
From NCERT
PMT - 1996
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

advertisementadvertisement

A ball of mass m1 and another ball of mass m2 are dropped from equal height. If time taken by the balls are t1 and t2 respectively, then 

1. t1=t22

2. t1=t2

3. t1=4t2

4. t1=t24 

Subtopic:  Uniformly Accelerated Motion |
 91%
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

With what velocity a ball be projected vertically so that the distance covered by it in 5th second is twice the distance it covers in its 6th second (g=10m/s2) 

1. 58.8 m/s

2. 49 m/s

3. 65 m/s

4. 19.6 m/s

Subtopic:  Uniformly Accelerated Motion |
 72%
From NCERT
PMT - 1997
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

A ball is dropped downwards. After 1 second another ball is dropped downwards from the same point. What is the distance between them after 3 seconds 

1.  25 m
2.  20 m
3.  50 m
4.  9.8 m

Subtopic:  Uniformly Accelerated Motion |
 73%
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

advertisementadvertisement

A stone is thrown with an initial speed of 4.9 m/s from a bridge in vertically upward direction. It falls down in water after 2 sec. The height of the bridge is 

1. 4.9 m

2. 9.8 m

3. 19.8 m

4. 24.7 m

Subtopic:  Uniformly Accelerated Motion |
 70%
From NCERT
PMT - 2003
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

A stone is shot straight upward with a speed of 20 m/sec from a tower 200 m high. The speed with which it strikes the ground is approximately 

1. 60 m/sec

2. 65 m/sec

3. 70 m/sec

4. 75 m/sec

Subtopic:  Uniformly Accelerated Motion |
 67%
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

A body freely falling from the rest has a velocity ‘v’ after it falls through a height ‘h’. The distance it has to fall down for its velocity to become double, is 

1. 2 h

2. 4 h

3. 6 h

4. 8 h

Subtopic:  Uniformly Accelerated Motion |
 81%
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

advertisementadvertisement

Velocity of a body on reaching the point from which it was projected upwards, is 

1. v=0

2. v=2u

3. v=0.5u

4. v=-u

Subtopic:  Uniformly Accelerated Motion |
 72%
From NCERT
AIIMS - 1999
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch