At a hydroelectric power plant, the water pressure head is at a height of \(300\) m and the water flow available is \(100\) m3 s-1If the turbine generator efficiency is \(60\)%, the electric power available from the plant is:
(Take \(g=9.8\) m s-2)
1. \(111.3\) MW
2. \(210\) MW
3. \(176.4\) MW
4. \(213.5\) MW